Installation

a) Despatch Department will ensure that the packed items will be delivered to the site with proper transport and handling and stored at appropriate places.

b)    Installation will be done according to the specifications and approved shop drawings by using advanced tools.

c)     Installation will  be done according to the submitted installation programme which  is based on the Main Contractor’s programme.

d)    Any damaged items at site will be returned to the factory for rectification / replacement.

e)     The site engineer / foreman will also liase with the Main Contractor to coordinate with other trades working in the same area and will ensure protection of our finished works until handing over with cardboard or plastic sheets as appropriate.  All installation and fixing will be in accordance with the engineers requirements and carried out with skilled workers.

f)     The Site Engineer will submit request form for inspection and approval of completed installation.

g)    All rubbish (ie. Packing and protection material) of Ajman Korea will be removed to designated skip locations provided by main contractor.

h)    Any snagging given will be attended on top priority basis.

i)     Prior to handing over, our own inspection team will thoroughly check our product and attend to the snags if any.